On Friday, November 7, 2020 we treated the GOEN LIME section in the Pace #102 Well with 3,000 gal of 15% HCL Acid. The well was shut-in allowing the treatment to “COOK”. Once the treatment was “SPENT” we proceeded to run 3 fluid test swabs before conditions were too dark to safely operate. The well was shut in over the weekend and our team returned today November 9, 2020 to continue swabbing the well. We have run a total of 7 swabs and are seeing consistent fluid entry from the Goen formation. The swab tests calculate to a total of 578 Barrels Of Fluid per Day with a 12.5% cut of oil. 578 barrels of fluid at 12.5 % oil cut = 71 BOPD.
PLEASE SEE ATTACHED VIDEOS
Leave a Reply